Skip to main content
Open Smart Grid - OpenSG
Login | Join | Help (new window)

Modify settings and columns

Open Smart Grid - OpenSG > SG Conformity > Shared Documents > CIM_TestingArtifacts > TestCaseArtifacts  

Shared Documents

Share a document with the team by adding it to this document library.
  
View: 
Part 9 Meter Disconnect Reconnect Abstract Test Case.docx
Part 9 Meter Disconnect Reconnect Abstract Test CaseUse SHIFT+ENTER to open the menu (new window).
5/16/2011 10:27 PMkay.stefferud
Part 9 Meter Outage OpenSG TestCasesWithX291.docx
Part 9 Meter Outage OpenSG TestCasesWithX291Use SHIFT+ENTER to open the menu (new window).
2/19/2011 7:42 PMkay.stefferud
Part 9 Meter Tampering Detection Abstract Use Case.docx
Part 9 Meter Tampering Detection Abstract Use CaseUse SHIFT+ENTER to open the menu (new window).
2/19/2011 7:40 PMkay.stefferud
Part 9 On-Demand Meter Read Abstract Use Case.docx
Part 9 On-Demand Meter Read Abstract Use CaseUse SHIFT+ENTER to open the menu (new window).
2/19/2011 7:45 PMkay.stefferud
Part 9 Scheduled Meter Read Abstract Use Case.docx
Part 9 Scheduled Meter Read Abstract Use CaseUse SHIFT+ENTER to open the menu (new window).
2/19/2011 7:40 PMkay.stefferud
x291_04_95_Conformace_Test_Abstract_Suite.pdf
x291_04_95_Conformace_Test_Abstract_SuiteUse SHIFT+ENTER to open the menu (new window).
1/27/2011 12:22 PMkay.stefferud